Switchgear & Motor Control Center Replacement O’Brien Water Reclamation Plant

The O’Brien WRP has been in service since the 1890’s.  In such harsh environments, electrical equipment quickly falls into disrepair.   Several pieces of electrical equipment did not meet current NEC requirements and replacing them had to be conducted all while maintaining the day-to-day operations.

Retrofitting equipment to suit Class 1 Division 1 environments is an undertaking that takes a specific skills and knowledge. BEI’s crews were more than qualified to undertake these tasks.  Five separate Motor Control Centers were replaced.  Each requiring it’s own planning to identify critical loads and temporary power them.  Crews worked 24/7 until each was functioning according to the customers specification.  Two units were relocated outside classified areas to new buildings.  BEI managed the new building construction from the ground-up.

A 4000A lineup of Low Voltage Switchgear provided power to all remote aeration batteries and final settling tanks.  A 1MW portable generator was used to power loads while two BEI crews worked 24/7 with rotating twelve hours shifts to remove and replace the switchgear. The lineup was tested and commissioned per requirements and specifications.

switchgear-motor-control-center-replacement-obrien-water-reclamation-plant_0 switchgear-motor-control-center-replacement-obrien-water-reclamation-plant_1 switchgear-motor-control-center-replacement-obrien-water-reclamation-plant_2 switchgear-motor-control-center-replacement-obrien-water-reclamation-plant_3 switchgear-motor-control-center-replacement-obrien-water-reclamation-plant_4 switchgear-motor-control-center-replacement-obrien-water-reclamation-plant_5 switchgear-motor-control-center-replacement-obrien-water-reclamation-plant_6
Client Metropolitan Water Reclamation District of Greater Chicago (MWRD)
Prime / Subcontractor PRIME
Location Skokie, IL
Dollar value $3,787,999.83
Year 2018 - 2020

Discover more

O’Hare Terminal 5 Concourse M Extension, Core Expansion & Repurposing – Fire Alarm Replacement
Complete Fire Alarm Replacement at International Terminal 5, O'Hare Airport.
O’Hare and Midway Airports System Infrastructure Upgrades
Installation, repair, and replacement of diverse infrastructures such as electrical, lighting, traffic control, security, audio-video, and public address systems.
Standby Generator Replacement
Standby Generator Replacement
O'Hare Airport East Airfield Lightning Control Vault
East Vault to support the lighting loads, circuits, and equipment of Runways 9C/27C, Runway 9R/27L extension
Install New Locking Controls
Install New Locking Controls – Big Muddy Correctional Center
Digester Sludge Heater System Upgrades and Boiler Removal Calumet  
Replace six boilers, associated water pumps, power, and controls in Class 1 Division 1 environments.
ORD Emergency and Standby Power System Generators 1-6 O’Hare International Airport
Replacement of existing emergency and standby generators
South Loop Elementary School – New Construction
New Construction of a Chicago Public School.