O’Hare Terminal 5 Concourse M Extension, Core Expansion & Repurposing – Fire Alarm Replacement

Furnish, deliver, and install a new addressable multiplex initiation and hardwired notification, electronically operated, UL listed fire alarm control panel, providing initiation and notification in accordance with authorities having jurisdiction.

Including a fire alarm control panel located within the fire command center on the Apron Level of O’Hare International Airport, providing control of the new addressable system.

ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_0 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_1 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_2 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_3 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_4 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_5 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_6 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_7 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_8
Client O’Hare 21/Austin Power Partners
Prime / Subcontractor Subcontractor
Location Chicago, IL
Dollar value $6,330,000
Year 2021 - Ongoing

Discover more

O’Hare and Midway Airports System Infrastructure Upgrades
Installation, repair, and replacement of diverse infrastructures such as electrical, lighting, traffic control, security, audio-video, and public address systems.
Standby Generator Replacement
Standby Generator Replacement
O'Hare Airport East Airfield Lightning Control Vault
East Vault to support the lighting loads, circuits, and equipment of Runways 9C/27C, Runway 9R/27L extension
Install New Locking Controls
Install New Locking Controls – Big Muddy Correctional Center
Digester Sludge Heater System Upgrades and Boiler Removal Calumet  
Replace six boilers, associated water pumps, power, and controls in Class 1 Division 1 environments.
Switchgear & Motor Control Center Replacement O’Brien Water Reclamation Plant
Remove and replace Motor Control Centers and Switchgear at The MWRD O’Brien Water Reclamation Plant.
ORD Emergency and Standby Power System Generators 1-6 O’Hare International Airport
Replacement of existing emergency and standby generators
South Loop Elementary School – New Construction
New Construction of a Chicago Public School.
Privacy Overview

This site uses cookies to ensure you get the best experience.  By clicking “Accept All”, you agree to the use and storing of cookies and similar tracking technologies on your device by us and our third party partners to enhance site navigation, analyze site usage, and assist in our marketing efforts, as set forth in our Privacy Policy