O’Hare Terminal 5 Concourse M Extension, Core Expansion & Repurposing – Fire Alarm Replacement

Furnish, deliver, and install a new addressable multiplex initiation and hardwired notification, electronically operated, UL listed fire alarm control panel, providing initiation and notification in accordance with authorities having jurisdiction.

Including a fire alarm control panel located within the fire command center on the Apron Level of O’Hare International Airport, providing control of the new addressable system.

ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_0 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_1 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_2 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_3 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_4 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_5 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_6 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_7 ohare-terminal-5-concourse-m-extension-core-expansion-repurposing-fire-alarm-replacement_8
Client O’Hare 21/Austin Power Partners
Prime / Subcontractor Subcontractor
Location Chicago, IL
Dollar value $6,330,000
Year 2021 - Ongoing

Discover more

O’Hare and Midway Airports System Infrastructure Upgrades
Installation, repair, and replacement of diverse infrastructures such as electrical, lighting, traffic control, security, audio-video, and public address systems.
Standby Generator Replacement
Standby Generator Replacement
O'Hare Airport East Airfield Lightning Control Vault
East Vault to support the lighting loads, circuits, and equipment of Runways 9C/27C, Runway 9R/27L extension
Install New Locking Controls
Install New Locking Controls – Big Muddy Correctional Center
Digester Sludge Heater System Upgrades and Boiler Removal Calumet  
Replace six boilers, associated water pumps, power, and controls in Class 1 Division 1 environments.
Switchgear & Motor Control Center Replacement O’Brien Water Reclamation Plant
Remove and replace Motor Control Centers and Switchgear at The MWRD O’Brien Water Reclamation Plant.
ORD Emergency and Standby Power System Generators 1-6 O’Hare International Airport
Replacement of existing emergency and standby generators
South Loop Elementary School – New Construction
New Construction of a Chicago Public School.