Projects
O’Hare Airport East Airfield Lightning Control Vault
Construction of a new $17 million East Vault to support the lighting loads, circuits, and equipment of Runways 9C/27C, Runway 9R/27L extension, and associated taxiways in O’Hare International Airport’s north airfield. Power requirements for the facility include two independent commercial electrical feeds supported by a one-second transfer switchgear, communications, natural gas, sanitary sewer and storm drainage, potable / domestic water, and limited fire suppression. Construction is sequenced into multiple phases, thus addressing the needs of the operational airfield and supporting the new and migration of existing airfield lighting control systems and airfield lighting circuits.
Discover more
O’Hare Terminal 5 Concourse M Extension, Core Expansion & Repurposing – Fire Alarm Replacement
Complete Fire Alarm Replacement at International Terminal 5, O'Hare Airport.
O’Hare and Midway Airports System Infrastructure Upgrades
Installation, repair, and replacement of diverse infrastructures such as electrical, lighting, traffic control, security, audio-video, and public address systems.
Digester Sludge Heater System Upgrades and Boiler Removal Calumet
Replace six boilers, associated water pumps, power, and controls in Class 1 Division 1 environments.
Switchgear & Motor Control Center Replacement O’Brien Water Reclamation Plant
Remove and replace Motor Control Centers and Switchgear at The MWRD O’Brien Water Reclamation Plant.
ORD Emergency and Standby Power System Generators 1-6 O’Hare International Airport
Replacement of existing emergency and standby generators
South Loop Elementary School – New Construction
New Construction of a Chicago Public School.