Install New Locking Controls
Replacement of existing Windows 95-based locking, lighting, and fan control systems and housing unit intercom systems, I/O boards, and relays utilizing new wiring provided from the penthouse area to all 4 housing unit door locks. Broadway Electric, Inc. installed new control systems to provide standalone computers for each cell house, segregation, and receiving area. This included new locking, lighting, and fan control consoles in each housing area guard station, and new intercom controls and speakers. Each housing unit being its own standalone system. The project replaces the touchscreen controls with a mouse/monitor served by the new computers. All wiring was reused when in the Segregation and Receiving area and new electronics were added for controls. New locks were provided for the first and second floors on one wing of a housing unit and the central guard area cell door.
Client
Capital Development Board (CDB)
Prime / Subcontractor
PRIME
Location
Big Muddy Correctional Center
Dollar value
$2,932,000.00
Year
2021- 05/2023
Discover more
O’Hare Terminal 5 Concourse M Extension, Core Expansion & Repurposing – Fire Alarm Replacement
Complete Fire Alarm Replacement at International Terminal 5, O'Hare Airport.
O’Hare and Midway Airports System Infrastructure Upgrades
Installation, repair, and replacement of diverse infrastructures such as electrical, lighting, traffic control, security, audio-video, and public address systems.
Standby Generator Replacement
Standby Generator Replacement
O'Hare Airport East Airfield Lightning Control Vault
East Vault to support the lighting loads, circuits, and equipment of Runways 9C/27C, Runway 9R/27L extension
Digester Sludge Heater System Upgrades and Boiler Removal Calumet
Replace six boilers, associated water pumps, power, and controls in Class 1 Division 1 environments.
Switchgear & Motor Control Center Replacement O’Brien Water Reclamation Plant
Remove and replace Motor Control Centers and Switchgear at The MWRD O’Brien Water Reclamation Plant.
ORD Emergency and Standby Power System Generators 1-6 O’Hare International Airport
Replacement of existing emergency and standby generators
South Loop Elementary School – New Construction
New Construction of a Chicago Public School.