Standby Generator Replacement
Provided new generator plant infrastructure to support the Hart-Dole-Inouye Federal Center (HDIFC), including the generators and all systems required to support the generators. Work included fueling, cooling, remote radiators, fans, and starting systems, renovations to various rooms and the adjacent surroundings including abatement; emission controls and turbochargers, fuel polishing, silencers, paralleling switchgear, remote monitoring, remote controls, monitoring of existing transfer switches, read-only connection to existing Building Automation System.
(BAS), and electrical equipment, feeders, and branch circuits contained within various locations. This project also included the installation of new medium voltage switchgear in room lC-G-VAULT and the connection of the new switchgear sections to the existing medium voltage switchgear.
Client
Department of Veterans Affairs
Prime / Subcontractor
PRIME
Location
Battle Creek, MI
Dollar value
$7,370,890.43
Year
2018 - 2021
Discover more
O’Hare Terminal 5 Concourse M Extension, Core Expansion & Repurposing – Fire Alarm Replacement
Complete Fire Alarm Replacement at International Terminal 5, O'Hare Airport.
O’Hare and Midway Airports System Infrastructure Upgrades
Installation, repair, and replacement of diverse infrastructures such as electrical, lighting, traffic control, security, audio-video, and public address systems.
O'Hare Airport East Airfield Lightning Control Vault
East Vault to support the lighting loads, circuits, and equipment of Runways 9C/27C, Runway 9R/27L extension
Install New Locking Controls
Install New Locking Controls – Big Muddy Correctional Center
Digester Sludge Heater System Upgrades and Boiler Removal Calumet
Replace six boilers, associated water pumps, power, and controls in Class 1 Division 1 environments.
Switchgear & Motor Control Center Replacement O’Brien Water Reclamation Plant
Remove and replace Motor Control Centers and Switchgear at The MWRD O’Brien Water Reclamation Plant.
ORD Emergency and Standby Power System Generators 1-6 O’Hare International Airport
Replacement of existing emergency and standby generators
South Loop Elementary School – New Construction
New Construction of a Chicago Public School.