egan-water-reclamation-plant-electrical-equipment-replacement-2016_0 egan-water-reclamation-plant-electrical-equipment-replacement-2016_1 egan-water-reclamation-plant-electrical-equipment-replacement-2016_2 egan-water-reclamation-plant-electrical-equipment-replacement-2016_3 egan-water-reclamation-plant-electrical-equipment-replacement-2016_4 egan-water-reclamation-plant-electrical-equipment-replacement-2016_5 egan-water-reclamation-plant-electrical-equipment-replacement-2016_6 egan-water-reclamation-plant-electrical-equipment-replacement-2016_7 egan-water-reclamation-plant-electrical-equipment-replacement-2016_8 egan-water-reclamation-plant-electrical-equipment-replacement-2016_9
Client Metropolitan Water Reclamation District of Greater Chicago (MWRD)
Prime / Subcontractor Subcontractor
Location Calumet
Dollar value $3,028,304.00
Year 2020 - 2023

Digester Sludge Heater System Upgrades and Boiler Removal Calumet  

BEI worked in close coordination with IHC to install underground feeders to ensure power was available to the new mechanical equipment.  a concrete encased ductbank of sixteen 4” fiberglass conduits were routed ¼ mile to the retrofitted electrical distribution building.  From there, twelve 3” fiberglass conduits were routed to each “cluster” of the anaerobic digester complex.

New motor control centers and distributed control system cabinets were located outside the harsh environment of the Class 1 Division 1 “Clusters”.  In the “Clusters” explosion proof pumps, actuators, starters, panelboards and more were installed to operate and control the new mechanical equipment.  As part of our Safety Guidelines BEI’s crew always wore Gas Monitoring Equipment while working.